Environmental Impact Statement
M7 Portlaoise - Castletown & M8 Portlaoise - Cullahill Road Scheme

Volume 3 The Human Environment

This document is only available in PDF format.

Table of Contents

Preface
Table of Contents
List of Tables
List of Figures
Glossary of Terms and Abbreviations

1. COMMUNITY IMPACTS
1.1 Introduction
1.2 Methodology
1.3 Existing Environment
1.4 Predicted impacts (Operational)
1.5 Predicted Impacts (Construction)
1.6 Mitigation Measures
1.7 Residual Impacts

2. NOISE AND VIBRATION
2.1 Noise
2.2 Vibration

3. AIR QUALITY
3.1 Introduction
3.2 Methodology
3.3 Existing Environment
3.4 Predicted Impacts of the Scheme
3.5 Mitigating Measures
3.6 Impacts and Mitigating Measures During Construction
3.7 Residual Impacts

4. LANDSCAPE AND VISUAL ASSESSMENT
4.1 Introduction
4.2 Methodology
4.3 Existing Environment
4.4 Operational Impacts of the Proposed Scheme
4.5 Constructional Impacts of the Proposed Scheme
4.6 Proposed Mitigation Measures
4.7 Residual Impacts

5. ARCHAEOLOGY
5.1 Introduction
5.2 Methodology
5.3 Existing Environment
5.4 Operational Impacts of the Scheme
5.5 Mitigation of Impacts
5.6 Construction Impacts and Mitigation Measures
5.7 Residual Impacts

6. ARCHITECTURE AND CULTURAL HERITAGE
6.1 Introduction
6.2 Methodology
6.3 Existing Environment
6.4 Predicted Impact
6.5 Mitigation
6.6 Residual Impacts

7. MATERIAL ASSETS AGRICULTURE
7.1 Introduction
7.2 Methodology
7.3 Existing Environment
7.4 Impact of the Proposed Scheme
7.5 Mitigation Measures
7.6 Residual Impacts

8. MATERIAL Assets - Non-Agricultural Properties
8.1 Introduction
8.2 Methodology
8.3 Existing Environment
8.4 Impacts
8.5 Mitigation
8.6 Construction Impacts and Construction Mitigation Measures
8.7 Residual Impacts