Environmental Impact Statement
M7 Portlaoise - Castletown &
M8 Portlaoise - Cullahill Road Scheme
Volume 5 Untolled Scheme And Summary Chapters
This document is only available in PDF format.
- For help on PDF click here
- Download Volume 5 Untolled Scheme And Summary Chapters Text as PDF (561k)
- View List of Drawings from Volume 5
Table of Contents
Preface
Table of Contents
List of Tables
List of Figures
Glossary of Terms and Abbreviations
1. UNTOLLED SCHEME
1.1 Introduction
1.2 Community Impact
1.3 Noise
1.4 Air Quality
1.5 Climate
2. THROUGH SCHEME SCENARIOS
2.1 Introduction
2.2 Scheme Description
2.3 Environmental Impacts
3. INTER-RELATIONSHIP AND INTERACTION OF EFFECTS
3.1 Introduction
3.2 Human Beings
3.3 Noise and Vibration
3.4 Air Quality
3.5 Landscape and Visual Aspects
3.6 Archaeology, Architecture and Cultural Heritage
3.7 Material Assets - Agriculture
3.8 Material Assets - Non-agriculture
3.9 Climate
3.10 Soils and Geology
3.11 Terrestrial and Aquatic Ecology
3.12 Drainage
3.13 Groundwater
4. SUMMARY OF MITIGATION MEASURES
4.1 Introduction
4.2 Construction Stage
4.3 Operational Stage
5. SUMMARY OF RESIDUAL IMPACTS
5.1 Community Impact
5.2 Noise and Vibration
5.3 Air Quality
5.4 Landscape and Visual
5.5 Archaeology
5.6 Architecture and Cultural Heritage
5.7 Material Assets - Agriculture
5.8 Material Assets - Non-agriculture
5.9 Climate
5.10 Soils and Geology
5.11 Terrestrial and Aquatic Ecology
5.12 Drainage
5.13 Groundwater
- Download Volume 5 Untolled Scheme And Summary Chapters Text as PDF (561k)
- View List of Drawings from Volume 5